Total Panel Load (amps) = Sum of All Circuit Loads (VA) / 240V Where: Circuit loads are measured in VA (volt-amperes), 240V is the line-to-line voltage for single-phase residential panels Scenario: Create a panel schedule for a 200A residential panel with 24 circuits. This calculator assumes a single phase supply and applies the same power factor through the adjusted demand and design stages. Use project standards and local codes for final equipment selection. Choose whether the known input is current. In this article, we will discuss how to prepare DB loading schedule, and the branch circuit load calculations related to it including, total connected loads. Always verify calculations with a. Design Distribution Box of one House and Calculation of Size of Main ELCB and branch Circuit MCB as following Load Detail. Power Supply is 430V (P-P), 230 (P-N), 50Hz. Step 2: Range, dryer, AC, and. Sizing an electrical panel wrong means tripped breakers, failed inspections, or worse — a fire hazard. Use this Electrical Load Calculator for Panel Scheduling to calculate total connected load, demand load, and recommended panel amperage using per-circuit load values, load types, and NEC-standard.